FC Barcelona Provides Updates on Financial Situation and Construction Progress of Spotify Camp Nou

As a preamble to the Ordinary General Assembly of FC Barcelona which will be held next Saturday with a telematic vote except for the senatorial members (the 1,000 oldest), who will be able to attend the Auditorium 1899, this was also the scene this Tuesday of an information session for the committing partners. The four vice presidents of the club participated. The first vice president, Rafa Yuste opened the session, giving way to the vice president of Economy, Eduard Romeothe Institutional Vice President, Elena Fortand the vice president of the Marketing Area, Juli Guiu They all gave details of the financial situation of the institution, the Barça spacethe contract with Ambilight TV and the rest of the topics on the agenda for Saturday.

As for the Barça spacethe vice president Elena Fort released new details about the status of the works, both those carried out this last year and those that will be carried out until the construction project of the Spotify Camp Nou by the company Limak Construction. The attending delegates were informed about what has been done during the last year and explained what the different phases of the construction process will be once the building license is received. In addition, they had the privilege of watching an unpublished video with virtual images of how the new Barça coliseum will progress phase by phase until it is completed in June 2026 with the entire roof already over all of the stands. The Twitter account @_Futbolero_ He has circulated it on social networks. In the Assembly next Saturday it will be broadcast again.

With the aim of returning to the house of Barça since 1957 in November 2024 with 60% of the capacity, work will begin on the land outside the stadium, leaving it now available for the circulation of fans and allowing access to the first and second stands. Starting from the exterior of the current façade, the terraces will be built on three different floors. Once it is equal to the second amphitheater, the construction of a new amphitheater will begin from there. double VIP ring which will begin the third tier, which cannot be occupied during the works. When it is completed, it will be the turn of the construction of the roof with photovoltaic panels and all the infrastructure to take advantage of wastewater. In June 2026, the deadline set by the club, the stadium must be fully completed.

Virtual image of the future Spotify Camp Nou

FC Barcelona

Virtual image of the future Spotify Camp Nou with the cover for all the stands

FC Barcelona

Virtual image of the future Spotify Camp Nou

FC Barcelona Read also
2023-10-19 20:04:54
#Spotify #Camp #Nou #built #step #step

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *