Tender Announcement: Fire Protection Inspection Service Project for Block C and Block D1 in Baseball Future Community Implementation Unit

Tender announcement for the whole process inspection service project of fire protection in block C and block D1 of the implementation unit of baseball future community
Shaoxing Bangcheng Construction and Development Co., Ltd. is responsible for the bidding of the baseball future community implementation unit C plot and D1 plot fire protection whole-process testing service project. The bidding application has been approved by the bidding management agency. According to relevant laws, regulations, rules and regulations, now Publicly publish the tender announcement. The relevant content is as follows:
1. Overview of bidding projects
1. Project name: The whole process inspection service project of fire protection in Block C and Block D1 of the implementation unit of Baseball Future Community,
2. Project location: Located in Xuedu (Baseball) Community, Yuecheng, Shaoxing, Dongpu Street.
3. Construction scale: ① The project land area of ​​Block C, the implementation unit of the baseball future community, is 60,435.9 square meters, with a total construction area of ​​217,090.10 square meters (excluding the overhead floor and sky garden balcony of 17,791 square meters), of which the construction area above ground is 151,089.31 square meters, and The construction area is 66,000.79 square meters; there are two floors underground, and 17-26 floors above the ground; the assembly rate of the baseball C plot is 50%; , of which the above-ground construction area is 37,129.4 square meters, the underground construction area is 42,474.66 square meters, the total building height is 20.15 meters, two floors above ground and two floors underground, and the assembly rate of baseball D1 plot is 60% and above.
4. Scope of bidding: conduct technical testing on building fire protection facilities and electrical safety of Block C and Block D1 of the Baseball Future Community Implementation Unit, and issue a test report. The specific contents include but are not limited to: ① Guidance on the design work of the project’s special fire protection project , review and review the design results documents at each stage, and provide optimization suggestions, etc.; ②All fire inspection services required by regulations such as building fire protection facility inspection, electrical inspection, and building fire inspection; ③Fire engineering technical guidance during the entire construction process, commissioning and acceptance stages, Including on-site random inspection and inspection of fire protection engineering installation, random inspection of fire protection products, equipment and materials, and on-site tracking service for the whole process of fire protection engineering; Fire protection inspection work, cooperate with the tenderer and the agent builder (the agent builder only manages and is responsible for the agent construction management and responsibility for the block C of the implementation unit of the baseball future community) to complete comprehensive services such as fire inspection and fire protection archives and data inspection; ⑤The final fire protection project is completed And after the commissioning is qualified, be responsible for the completion inspection and issue a fire inspection report that meets the requirements of the relevant competent authority.
5. Bidding method: public bidding; qualification review method: post-qualification review.
6. Bidding control price: 489,545 yuan (of which: 358,199 yuan for plot C and 131,346 yuan for plot D1);
7. Source of funds: self-raised.
8. Quality requirements: In accordance with the relevant national norms, standards, regulations and design requirements of the fire control department, in-depth on-site inspection and testing, put forward rectification suggestions for existing problems, issue qualified inspection and testing reports and pass the fire inspection and acceptance. The inspection report should meet the corresponding fire protection requirements, and carry out the whole-process fire protection inspection service and submit relevant materials in a timely manner according to the requirements of the tenderee and the agent builder (the agent builder only manages and is responsible for the agent construction of Block C, the implementation unit of the baseball future community).
9. Service period: ①Block C, the implementation unit of the future baseball community: from the date of signing the contract to the date when the fire protection inspection and acceptance of the block C of the baseball is passed, and the date of the completion acceptance of the project is filed; ②Block D1, the implementation unit of the future baseball community: from the date of the contract From the date of signing to the date when the fire protection acceptance of the baseball D1 plot is passed and the project completion acceptance is filed.
2. Enterprise qualification requirements:
1. Bidders must be included in the inspection list of building fire protection facilities on the Shaoxing Administrative Approval Service Intermediary Network.
2. The bidder and the person in charge of the project must have been publicized in the fire technical service organization and registered fire engineer business information management system (website https://shhxf.119.gov.cn) (the bidder’s service type must include: fire protection facility maintenance maintenance testing/fire safety assessment).
3. Consortium bids are not accepted for this project.
4. Qualification requirements for the person in charge of the project: have the qualification of a registered fire engineer; The endowment insurance payment list or certificate of the social security institution to which the bidder belongs in June 2009 (the name of the payment unit and the bidding unit must be the same, and the special stamp or electronic stamp for social security payment certification must be affixed). If the person in charge of the project prepares for the business, he must provide a social security certificate issued by the personnel agency center from April 2023 to June 2023 (the special stamp of the personnel agency center is required); the social security certificate of the branch company that is not an independent legal person efficient.
5. Requirements for obtaining bidding documents and materials: bidders submit the following materials to the staff within the specified time (email notes contact person and contact information, QQ mailbox, etc.): unit introduction letter, authorized client ID card, business license, listed Screenshots of the building fire protection facilities inspection directory on the Shaoxing Administrative Approval Service Intermediary Network, bidders and project leaders must have screenshots (websites) in the fire technical service agency and registered fire engineer business information management system, project leader registration certificate, project leader Endowment insurance payment list or certificate. All the above materials need to be stamped with the official seal on each page and sent to email [email protected] in the form of scanned copies. In the event that the same bidding unit repeatedly obtains bidding documents, the time leader who submits the materials shall prevail. Bidding documents will be sent electronically to the mailboxes of all bidders.
6. Bidding document cost: 0 yuan.
7. Time for obtaining bidding documents: August 7, 2023 to August 8, 2023 (8:30 am to 11:30 am, 14:00 pm to 17:00 pm every day) (except public holidays)
3. Other related content
1. Shortlisted method of bid evaluation: all shortlisted. Deadline for submission of tender documents: 9:30 on August 16, 2023, location: Conference Room 116, Annex Building, Traffic Investment Building, No. 135 Fenglin West Road, Shaoxing City.
2. Bid deposit: RMB 8,000, bidders should transfer to the following account by telegraphic transfer (according to the arrival time) before 16:00 on August 8, 2023: (account name: Zhejiang Mingye Project Management Co., Ltd. Company, account number: 389658340837, bank of deposit: Bank of China Keqiao Sub-branch), and bid documents that have not paid the bid bond will not be accepted.
3. Bid evaluation method: comprehensive evaluation method, setting technical bids.
4. This project adopts the bid opening method where the bidders do not meet each other.
5. The bidding announcement is published on Shaoxing Public Resources Trading Network (http://ggb.sx.gov.cn) and Shaoxing Transportation Investment Group Co., Ltd. website (http://www.sxsjttz.cn).
6. If the relevant content of this announcement is inconsistent with the officially issued bidding documents, the officially issued bidding documents shall prevail.
Complaint acceptance department: Shaoxing Transportation Investment Group Co., Ltd., contact person: XCMG, complaint and query telephone number: 0575-88718612.
7. Contact information
Construction unit: Shaoxing Bangcheng Construction and Development Co., Ltd.
Address: Jiaotou Building, No. 135 Fenglin West Road, Shaoxing City
Contacts: Register for free to view
Phone: Register for free to view
Mail: /

The agent builder (the agent builder is only responsible for the agent construction management and responsibility for the implementation unit C of the baseball future community):
Greentown Real Estate Construction Management Group Co., Ltd.
Address: No. 767, Wenyi West Road, Xihu District, Hangzhou
Contact: Sun Jie
Tel: 18768194254
Mail: /

Bidding agency: Zhejiang Mingye Project Management Co., Ltd.
Address: 7th Floor, Sinopec Building, No. 111 Jiefang Avenue, Shaoxing City
Contact: Zhang Zhen
Phone: Register for free to view
E-mail: [email protected]

2023-08-04 04:49:34
#Tender #Announcement #Fire #Protection #Process #Inspection #Service #Project #Block #Block #Baseball #Future #Community #Implementation #Unit #Jianyu #Biaoxun

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *