Approval of the Feasibility Study Report on the City’s Top Ten Boutique Libraries and Badminton Halls in Qingshanhu District – Qingshanhu District People’s Government

Hufa changed the line (2021) No.03No

Approval of the Feasibility Study Report on the City’s Top Ten Fine Libraries and Badminton Halls in Qingshan Lake District

Tangshan Town People’s Government

The “Letter on the Application for Approval of the Feasibility Study Report of the Top 10 Excellent Libraries and Badminton Hall Projects in Qingshan Lake District” (Letter from Tang Zheng[2020]32No.) and related materials have been received. entrusted by me,Tianhe National Consulting Holding Group Co., Ltd. Jiangxi BranchrightZhipu International Engineering Consulting Co., Ltd.The “Feasibility Study Report of the Top 10 Fine Libraries and Badminton Hall Projects in Qingshan Lake District” compiledreview and publishWith “Qingshan Lake District, the city’s top ten libraries and badminton hall project feasibility study report evaluation report”.After research, the feasibility study is agreed in principleThe contents of the report are now clarified as follows:

one,Project name and code:Qingshan Lake District’s Top Ten Excellent Libraries and Badminton Hall Projects (Coded)2020-360111-80-01-049813)。

two,project constructionDesign unit: The project owner is the Tangshan Town People’s Government, and the construction agency isNanchang Qingshan Lake Investment Group Co., Ltd.

three,Project construction site: located in Danxia Sports Park, Qingshanhu District, Nanchang City.

4. Main construction content of the project: The planned land area of ​​the project is7441.65square meters (approx.11.16mu), the total construction area is3302.10square meters, of which the building area of ​​Conch Bookstore1503.44square meters, the building area of ​​the badminton hall1798.66Square meters, the main construction contents of the project mainly include civil engineering, facade decoration engineering, decoration and decoration engineering, strong and weak electricity engineering, water supply and drainage engineering, HVAC engineering, fire protection engineering, outdoor greening, road hardening and paving, fence, outdoor Ancillary projects such as pipelines.

5. Main economic and technical indicators of the project. (See attachments1

6. Total investment and capital source of the project: The investment amount of this project is2603.23million. Among them: construction cost of 17,242,900 yuan, equipment purchase cost of 1,850,000 yuan, and installation cost of 2,720,600 yuanTen thousandRMB 2,290,500 for other construction projects and RMB 1,928,300 for reserve.The source of funds is the district financial appropriation.

7. Project construction period12month (2020year11moon-2021year11moon).

8. The project construction unit is requested to strictly implement the relevant provisions of the state on tendering and bidding, and follow the annexes of this article in accordance with the law.2Regulations are enforced.

9. Project related documents: “Summary of the Executive Meeting Minutes of the Qingshanhu District People’s Government of Nanchang City (19)》(2020year11moon17Day), the relevant leaders of the Tangshan Town People’s Government and Nanchang Qingshan Lake Investment Group Co., Ltd.2021year1moon8Japan), Nanchang Natural Resources Bureau Qingshan Lake Branch “Opinions on the Preliminary Review of the City’s Top Ten Excellent Libraries and Badminton Hall Projects in Qingshan Lake District” (Hong Zhan Zihu Zi)[2020]142No).

10. Please prepare the preliminary design documents as soon as possible and submit them to our committee for approval.

This reply.

appendix1: The city’s top ten boutique libraries and badminton hall projects in Qingshan Lake DistrictEconomic and technical indicators table

appendix2: Approval Opinion Form for Tender Items

Development and Reform Commission of Qingshan Lake District, Nanchang City

2021year1moon21Day

(This piece is made public)

appendix1

The city’s top ten boutique libraries and badminton hall projects in Qingshan Lake DistrictEconomic and technical indicators table

name

Numerical value

unit

Remark

total planned land area

7441.65

about11.16mu

Total surface area

3302.10

Capacity building area

3302.10

in

Conch Bookstore

1503.44

two floors

badminton court

1798.66

layer

Building area not included

0.00

Volume rate

0.44

gross floor area

2989.39

building density

40.17%

Bookstore service population

6

10,000 people

Bookstore collection

7.50

ten thousand volumes

reading seat

100

seat

Number of badminton courts

10

indivual

appendix2

Approval Opinion Form for Tender Items

Project Name: Top 10 Fine Libraries and Badminton Halls in Qingshan Lake District

Bidding scope

Tender Organization Form

Bidding method

not adopted

Bidding method

all

tender

part

tender

on their own

tender

entrust

tender

public

tender

invite

tender

survey

approved

approved

approved

design

approved

approved

approved

construction works

approved

approved

approved

Installation work

approved

approved

approved

Supervision

approved

approved

approved

equipment

approved

approved

approved

other

approved

approved

approved

Explanation of the approval opinions of the approval department:

1.According to the “Basic Tendering Situation Form” submitted by the project owner, the construction unit management fee, special evaluation fee, various fees and other items that are not subject to bidding according to laws and regulations in this approval form do not require bidding. Temporary facility projects, preliminary work fees, and preparatory fees involving engineering construction must be publicly entrusted to tender for all items that must be tendered in accordance with laws and regulations.

2.According to the “Basic Information Form of Bidding” submitted by the project owner, the important materials of this project are included in the construction engineering and installation engineering, and have not been approved separately.

3.China Daily, China Economic Herald, China Construction News, China Procurement and Tendering Network, Jiangxi Daily, Information Daily, Jiangnan Metropolis Daily, Jiangxi Tendering and Bidding Network are the tender announcements legally designated by the National Development and Reform Commission and Jiangxi Provincial Development and Reform Commission. Publishing medium, the project unit must choose one of them to publish the tender announcement.

4.according to“Summary of Minutes of the Executive Meeting of the Qingshanhu District People’s Government of Nanchang City (19)》(2020year11moon17day) spirit, the project takesEPCGeneral contracting (design, procurement, construction) mode for bidding.

Approval Department(stamp)

    
2021
year1moon21Day

Comments

Leave a Reply