Haidian District Adds 41 Sports Venues and Updates 2,000+ Facilities

Haidian District has completed the installation of 41 new sports facilities and updated more than 2,000 pieces of fitness equipment across its neighborhoods, part of a city-wide effort to expand local exercise access.

In the Wufu Linglongju community in the Balizhuang sub-district, 68-year-old resident Zhang reported that the new installations replaced equipment that had become loose and unusable. Across the district, the upgrades include the installation of specialized areas for table tennis, cage basketball, badminton, and gateball.

In the Yiqingyuan community of the Xisanqi sub-district, officials oversaw the construction of a 166-square-meter badminton court. The facility features a 9mm-thick silicon polyurethane surface designed for shock absorption and anti-slip performance, complemented by standard lighting and perimeter fencing.

Residents participated in the planning process through public hearings, where they identified “fitness deserts” or areas where existing equipment had reached the end of its service life. This feedback loop allowed the district to prioritize new construction in underserved areas while replacing outdated machines in established parks.

At the Chapeng Park in the Zhongwu community of the Sijiqing town, the upgrade replaced weathered, peeling equipment with 19 new outdoor sets. The new inventory includes elliptical trainers, rowing machines, and various muscle-toning apparatuses intended to serve a wide range of age groups.

According to the district’s current data, there are 6,183 sports venues in Haidian, covering approximately 10.65 million square meters, with an estimated 58.1% of the population participating in regular physical exercise.

Safety standards were applied throughout the procurement and installation process, with the district sports bureau conducting site inspections before and after completion. To ensure the long-term utility of the new assets, the bureau has implemented a mandatory maintenance schedule. This includes at least two comprehensive inspections per year, supplemented by routine patrols by street and community staff to identify and repair damage immediately.

“We will continue to refine the layout of grassroots public sports facilities,” an official from the district sports bureau stated regarding the ongoing strategy to improve health outcomes for residents.

Editor-in-Chief

Editor-in-Chief

Daniel Richardson is the Editor-in-Chief of Archysport, where he leads the editorial team and oversees all published content across nine sport verticals. With over 15 years in sports journalism, Daniel has reported from the FIFA World Cup, the Olympic Games, NFL Super Bowls, NBA Finals, and Grand Slam tennis tournaments. He previously served as Senior Sports Editor at Reuters and holds a Master's degree in Journalism from Columbia University. Recognized by the Sports Journalists' Association for excellence in reporting, Daniel is a member of the International Sports Press Association (AIPS). His editorial philosophy centers on accuracy, depth, and fair coverage — ensuring every story published on Archysport meets the highest standards of sports journalism.

Football Basketball NFL Tennis Baseball Golf Badminton Judo Sport News