The Fair-Play BA-7107 baseball scoreboard requires all installation and structural drawings to be reviewed by a licensed professional engineer before any construction begins.
According to the official instruction manual, this requirement ensures that the unit is safely integrated into its environment, as the manufacturer assumes no responsibility for installations performed by third parties.
The scoreboard’s columns and footings are engineered to comply with IBC 2021 120 MPH Exposure B standards. The product itself exceeds these requirements as mounted in the provided design drawings, which assume average soil conditions with allowable stresses of 2500 psf. If local soil conditions, clearance requirements, or building codes differ from these specifications, the design must be altered accordingly.
For electrical setup, the location of the owner’s fused disconnect switch is left to the installer’s discretion, provided it remains in compliance with Section 600.6(A) of the National Electrical Code.
The manual specifies that power wires must be routed in a separate conduit from the control cable to prevent interference. Furthermore, installers are advised to use a 3/4-inch conduit for buried control cables in any areas where they might be subject to mechanical damage.
The installation manual outlines specific structural dimensions, referenced in documents 01-7107-13-1 and 01-7107-13-2, including a column section of W4 x 13. The physical layout includes various measurements labeled A through H, ranging from 1 1/4 inches to 7 feet.
Fair-Play notes that additional general installation guidance is available in document 01-0500-01, which operators are required to review and acknowledge as part of the formal project sign-off process. Any modifications to these established specifications must be coordinated through a Fair-Play sales representative.
As part of the formal installation process, customers must sign an authorization document confirming they have received and read the specifications found in document 01-0500-01. The required sign-off statement reads:
“MEINE UNTENSTEHENDE UNTERSCHRIFT BEDEUTET, DASS ICH MIT DEN HIER BESCHRIEBENEN KONSTRUKTIONSARBEITEN EINVERSTANDEN BIN UND BESTÄTIGE, DASS ICH DIE INSTALLATIONSSPEZIFIKATIONEN IM FAIR-PLAY-DOKUMENT NR. 01-0500-01 ERHALTEN UND GELESEN HABE.”
This confirmation is part of the project documentation, which includes spaces for the project title, signature, date, reference number, and the name of the authorized individual. Any inquiries regarding changes to these documents should be directed to a company sales representative.
Users seeking specific installation data can utilize search tools to locate manuals by brand and full model name. According to the independent library Manuals+, users should verify that the model name matches the device label exactly to account for potential derivative or similar models. While many documents are available for online viewing, PDF downloads are only provided if the specific file format is supported by the individual document page.
In cases where a manual is unavailable, users may request a guide via a manual generation feature or upload their own documentation to share with the community. These resources are provided as a supplement to the technical specifications, with the original release of the BA-7107 documentation dated 07-08-26.